Key takeaways

  • Verify zoning, setbacks, access, utilities, and foundation conditions first.
  • Use a compact plan that protects storage, privacy, daylight, and furniture clearances.
  • Coordinate site preparation and the delivery plan with factory fabrication.
01

Feasibility and site fit

Begin with zoning, setbacks, utility capacity, access, grade, and placement. These constraints help determine whether a single module or a combined footprint is the more practical approach.

02

Design the compact plan

Prioritize natural light, storage, privacy, and furniture clearances. Grouping kitchens, bathrooms, and mechanical systems can simplify utility runs and preserve more usable living space.

03

Fabricate in a controlled workflow

The shell is prepared, openings are reinforced, framing and rough systems are installed, and finishes follow. Factory-style sequencing improves coordination and allows inspections at defined milestones.

04

Prepare for delivery and set

Foundation work, utility stubs, drainage, and access should be ready before arrival. A coordinated set plan covers transport, lifting, final positioning, connections, and site completion.